5 minutes Digitalisation Koralmtunnel meets BIM The RSRG relies on modern technology and digital operations for the large-scale Austrian Federal Railways (ÖBB) project in south-eastern Austria. 3 minutes Digitalisation Digital transformation in railway technology All details at a glance. 3 minutes Digitalisation BIM in operation - what we learned from our experience SBB Weichenlos ('switch lot'): ever greater role of the New Cooperation Models. 5 minutes Digitalisation More than BIM Digitalization across the Project Life Cycle 3 minutes Digitalisation So digitalisation runs smoothly Print edition 2021 The first component of construction site digitalisation: Sersa introduces the data hub. 3 minutes Digitalisation A model with future Print edition 2021 With Smart Maintenance, Sersa inspires confidence in smaller infrastructure companies and industrial clients in particular. 5 Minuten Digitalisation Digitalisation brought to life Printausgabe 2021 The Rhomberg Sersa Rail Group and Swisscom won the award for their “digital construction site”. 1 minute Digitalisation Welcome to the Rhomberg Sersa Rail Group: "Bud" Print edition 2021 RSRG was to be the first business in Europe to use and test a robotic dog from Boston Dynamics: the spot “Bud”. 3 minutes Digitalisation Always live Print edition 2021 Besseres Service durch den Einsatz modernster Plattformtechnologie im Baustellenmanagement 5 minutes Digitalisation Overcoming improvisation Print edition 2021 Die Rhomberg Sersa Rail Group entwickelt mit BIM den optimalen Bauablauf 4 minutes Digitalisation Reality Capture Print edition 2021 The link between the real and the digital world. 3 minutes Digitalisation New cooperation models Print edition 2021 A one-stop shop for planning and building. More contributions