Machinery

KRC1200 -2

KRC1200-2.jpg
Reading time: 2 Minuten

Significantly more powerful - the new KRC1200-2

Sersa setzt seit Jahren einen der ersten Schienenkrane vom Typ KRC1200 für Weichenbaustellen in der Normalspur ein. Ende 2018 begannen Abklärungen für ein optimiertes Nachfolgemodell. Der neue KRC1200.2 wird ab Herbst eingesetzt.

 

For years, Sersa has been using one of the first KRC1200 rail ranes on standard-gauge points construction sites. Investigations into an optimised successor model began in late 2018. The new KRC1200-2 will come into use in autumn.

 

The KRC1200-2 takes up the counterbalance in a single step, thereby achieving significantly shorter set-up and take-down times. The balance car and buffer wagon are each mounted on a container wagon, forming a compact unit with the crane. Different configurations of the distance and height adjustable supports enable a perfect adaptation to the individual loading conditions. The optimised boom design and sophisticated sensors/controls allow the KRC1200-2 to rotate 360° without any supports, using its counterbalance and cross-beam, and to lift significantly heavier loads in profile-free operation. The form-matched counterbalance is carried along for up to five degrees, resulting in more efficient and safe operation. 

0
My keep track
Share bookmark
keep-track-bestellen
Order the 2023 issue