The Rhomberg Sersa Rail Group Switzerland has already been based in Landquart for two years.
Since then, Sersa Maschineller Gleisbau AG and Donatsch Söhne AG have been working together to implement challenging projects and maintain track construction machines.
In addition to the construction of new special vehicles for the meter gauge, retrofits are also being carried out in Landquart – all meter-gauge conversion projects in Switzerland are coordinated and implemented here.
Its central location has many advantages: It is located directly on the SBB and RhB networks, which ensures the best possible service and connections to standard and meter gauge. To achieve Rhomberg Sersa Rail Group's planned step towards efficiency, we are optimising our buildings and track systems. Initial clarifications and project studies are already underway.
In future, mechanised track construction in Switzerland will be c
oncentrated at the Effretikon, Hinwil and Landquart sites. The Effretikon and Hinwil sites will mainly be in charge of the standard gauge while Landquart will be responsible for the meter gauge. This focus reduces enormous logistics, time and transport costs and brings the company a significant step closer to our goal of “zero emissions” in mechanised track construction.